Part 3 Installation
Commissioning
The following commissioning checks must be
carried out before the Gas Griddle Toaster is
handed over for use, to ensure that the unit
operates correctly and the operator(s) understand
the correct operating procedure.
1. Before leaving the new installation;
a. Check the following functions in accordance
with the operating instructions specified in
the “Operation” section of this manual.
 Light the Pilot Burners.
 Light the Main Burners.
 Check the Low Fire Burner operation.
 Check the High Fire Burner operation.
b. Ensure that each operator has been
instructed in the areas of correct lighting,
operation, and shutdown procedures for the
appliance.
2. This manual must be kept by the owner for future
reference and a record of Date of Purchase,
Date of Installation and Serial Number of Unit
recorded and kept with this manual. (These
details can be found on the Rating Plate
attached to the inner R/H side panel, beneath
the middle shelf.
NOTE:
If for some reason it is not possible to get the
appliance to operate correctly, shut off the gas
supply and contact the supplier of this unit.